Dustron PC NM Non Metal Mies Haul Roads & Over burden area
DUSTRON PC NM (COMPOUND) is suitable for haul road dust suppression in Non Metal mines, overburden area and mineral stockyard. It fulfils the rules & regulation of RCRA (RESOURCE CONSERVATION AND RECOVERY ACT) of USA & CPCB (CENTRAL PLLUTION CONTROL BOARD) & all other regulatory bodies (DGMS, etc) of INDIA. It fulfils the following rules & regulation
Advantages
Dust free environment
Biodegradable
Environment friendly
Nontoxic
Air borne dust under permissiable limit
No effect on
Human health
Aquatic life
Plant & grass
Earth worm
No diseases occur
Due to dust
Due to fungi (over watering)
Minimum saving
Water – 60 to 80% in 1:2500 & 40% in 1:5000.
Fuel of water sprinklers - 60% to 40%
Electricity / diesel for pumping of water – 40%
Medicine cost
No Hampered on transportation due to dust free haul roads
No Hampered of works due to sound health
No
Mud formation
Stag dust found in the winter season
Effect of grader, dozzer & h.e.m.m. Movements
Accidents occur due to dust free environments
Increases in comparision to normal water spraying
Production & productivity
Moisture 65% to 80%
Road streangth 70 % approx
Rewetting of soil
Life of spare parts of hemm & lmv
Life of lubricants
Life of tyres
Life of water tanker by corrosion inhibition (about 20% for mild steel, 62% for bronze, 17% for copper, 74% for aluminium)
Decreases in comparision to normal water
The maintenance cost of HEMM & LMV
The maintenance cost of haul roads due to very - very improved road
Application Area:
Haul Roads in METAL Mines (CHROMITES)Haul Roads in NON METAL (LIMESTONE, DOLOMITE, BARITE, etc) Mines
Overburden Area & Roads in NON METAL MINERAL Mines
Roads of NON METAL MINERAL Stock Yard in Iron Steel Plant
Roads of NON METAL MINERAL Stock Yard in Metal Smelting Plant
Roads of NON METAL MINERAL Stock Yard in Mineral Beneficiation Plant
Roads of NON METAL MINERAL Stock Yard in Cement Plant
Application System:
Treatment of haul road surface to be done every Day in the second half of first shift. In a month total no of days of applications will be necessary. However, during the initial treatment quantum of DUSTRON may vary in the ratio of 1:2500 to 7500 depending upon the soil conditions, temperature, humidity, load and speed of Dumpers. If in emergency there will be any lean day such as holiday for the treatment of chemicals, there will be minor effect or no effect. Application can be done from an ordinary tank lorry or converted Tank Lorry or converted Tanker from Dumpers. No steering is required; the chemical is automatically mixed with water. The mixture of DUSTRON and water should be in a ratio of 1: 2500 to 5000 (1 Kg of DUSTRON to be mixed with 2500 to 5000 Litres. of water).
Pattern of applications:
1st day to 3rd day - 3 times
4th day to 6th day - 2 times
7th day to onwards - 1 times
Satisfactory performance period:
In 1:2500 – The satisfactory Performance will be observed within 07 (Seven) days with application pattern maximum. Result will be observed from 3rd day with necked eye.
In 1:5000 – The satisfactory Performance will be observed within 10 (Ten) days with the application pattern minimum. Result will be observed from 7th day with necked eye.